{"id":2872,"date":"2019-12-02T15:03:06","date_gmt":"2019-12-02T14:03:06","guid":{"rendered":"https:\/\/www.cigre.nl\/study-committee-members-c3\/"},"modified":"2026-10-30T17:26:41","modified_gmt":"2026-10-30T16:26:41","slug":"study-committee-members-c3","status":"publish","type":"page","link":"https:\/\/www.cigre.nl\/en\/study-committee-members-c3\/","title":{"rendered":"Study Committee members C3"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>C3 Power system sustainability and environmental performance<\/strong><br>Scope:&nbsp;Three technical directions have been defined:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Asset management and environment\/surroundings<\/li>\n\n\n\n<li>General environmental developments and energy companies<\/li>\n\n\n\n<li>Stakeholder engagement and public acceptance<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The Study Committee has two main tasks: to identify and assess the impact of electricity systems on the environment and surroundings and to make recommendations on measures to manage the impact. <br>The concept of \u2018influence on the surroundings\u2019 is interpreted broadly: it covers both the physical influence and its social aspects. Subjects include greenhouse gases (e.g. SF6 use), soil and water pollution, EM fields, noise (nuisance), visual aspects, impact on flora and fauna, but also stakeholder engagement and public acceptance. In other words: the three Ps of sustainability: people, planet and profit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you would like more information, or might be interested in playing an active role in the Study Committee, please contact the Chair of the Study Committee.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td>Chair<\/td><td>Joris den Breejen<\/td><td>TenneT TSO<\/td><td><a href=\"mailto:Joris.den.Breejen@tennet.eu\" target=\"_blank\" rel=\"noreferrer noopener\">Joris.den.Breejen@tennet.eu<\/a><\/td><\/tr><tr><td>Secretary<\/td><td>Robert-Paul van Campen<\/td><td>Qirion<\/td><td>robert-paul.van.campen@qirion.nl<\/td><\/tr><tr><td>Member<\/td><td>Josu Egusquiza<\/td><td>Hyonsung<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Garnt Swinkels<\/td><td>TenneT TSO<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Claire Deurvorst<\/td><td>TenneT TSO<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Paul Hartman<\/td><td>Enexis<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Linda Ritzen<\/td><td>Stedin<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Astrid Schellings- Koekoek<\/td><td>Movares<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Rowdy Grieken<\/td><td>TenneT TSO<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Joanne de Bruin<\/td><td>Gasunie<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Pierre Oskam<\/td><td>Stedin<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Ward van Schaagen<\/td><td>Sweco<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Yiri Massop<\/td><td>DNV<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Emile Bruschinski<\/td><td>ESEP<\/td><td><\/td><\/tr><tr><td>Member<\/td><td>Rob Dijcker<\/td><td>Witteveen + Bos<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>C3 Power system sustainability and environmental performanceScope:&nbsp;Three technical directions have been defined: The Study Committee has two main tasks: to identify and assess the impact of electricity systems on the environment and surroundings and to make recommendations on measures to manage the impact. The concept of \u2018influence on the surroundings\u2019 is interpreted broadly: it covers &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.cigre.nl\/en\/study-committee-members-c3\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Study Committee members C3&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-2872","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.cigre.nl\/en\/wp-json\/wp\/v2\/pages\/2872","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cigre.nl\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.cigre.nl\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.cigre.nl\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cigre.nl\/en\/wp-json\/wp\/v2\/comments?post=2872"}],"version-history":[{"count":4,"href":"https:\/\/www.cigre.nl\/en\/wp-json\/wp\/v2\/pages\/2872\/revisions"}],"predecessor-version":[{"id":3529,"href":"https:\/\/www.cigre.nl\/en\/wp-json\/wp\/v2\/pages\/2872\/revisions\/3529"}],"wp:attachment":[{"href":"https:\/\/www.cigre.nl\/en\/wp-json\/wp\/v2\/media?parent=2872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}